7 stages of change management from Visible Ops
From
The Visible Ops Handbook,
- Oblivious - "Hey, did the switch just reboot?"
- Aware - "Hey, who just rebooted the switch?"
- Announce - "Hey, I'm rebooting the switch. Let me know if that will cause a problem."
- Authorise - "Hey, I need to reboot the switch. Who needs to authorise this?"
- Schedule - "When is the next maintenance window - I'd like to reboot the switch then?"
- Verify - "Looking at the fault manager logs, I can see that the switch rebooted as scheduled."
- Manage - "Let's schedule the switch reboot to week 45 so we can do the maintenance upgrade and reboot at the same time."
No comments:
Post a Comment